Data Team Sprint Demo
It’s fitting that this journal series is concluding with the reporting of a Sprint Demo in which the presentation of the final production data, and corresponding data visualisations in Tableau, was showcased to stakeholders. Although the PRJ701 project ends here, the work continues. There is still plenty the team aims to achieve over the next quarter and first half of next year, some of the immediate sprint items for the next fortnight are as follows:
- Create a staging environment for Tableau, now it is capable of being used by stakeholders it is important that any testing is not performed on the production instance
- Build upon the sales representative performance dashboard, including an increased number of metrics without having to produce a separate dashboard for each sales representative i.e. use filtering to lock down information based on the user account
- Create and implement naming conventions in dbt and Tableau and document the structure
- Complete the remaining stakeholder interviews globally to provide direction for the team over the next quarter and beyond
Staging and Production Tableau Environment
Prior to the scheduled sprint demo the data visualisation was connected to the production data which will allow it to be used, and relied upon, by the business stakeholders. The migration from development to production data required changes to the IP address-based security permissions. The IP address for Tableau Cloud had been whitelisted, however, the desktop instance connects to the data through the local network. This is less than desirable from a security standpoint, but necessary as data connections can only be created in the Tableau Desktop instance. There are additional benefits to using Tableau Desktop, it includes more features and functionality, it is a faster method of creating a visualisation, and worksheets can be tested before publishing to the cloud instance.
Uptime and accuracy must be considered as a result of the production release, any further testing and upgrades now need to be performed in a staging sandbox environment to reduce the risk that technical errors affect larger groups of system users. This staging environment will allow the technical team to develop the service in isolation from the rest of the project team, changes can be presented in the demo meetings and validated before being made live in the production environment.
Preliminary research indicates that Tableau Server licensing allows for a single production environment and a further two pre-production environments. However, the pipeline deploys Tableau Desktop, which does not appear to have this feature. In effect, the desktop instance is acting as the staging environment, with the cloud instance being production. This does lead to problems, unvalidated changes could be published accidentally, causing unintended errors with the cloud production instance.
At this stage the only option appears to be the replication of the current production version in the desktop instance, publishing it to the cloud with permissions restricting access to the environment to only those members of the project team involved in development. Testing can be performed in this environment completely separate from the production environment, with changes moved across and version-controlled to ensure the validity of the data, and retain the reliability of the production environment.
It might be preferable to establish a connection from the development data into the staging sandbox environment, isolating it entirely from the production environment. This will require further consideration, despite the development data environment reflecting the production environment, it is updated daily not being part of the data stream, which might delay production implementation. Conversely, a Tableau staging environment that is connected to the development environment would allow the technical team to assess how changes to the data warehouse schema might affect the production instance of the data visualisations. The trade-off will need to be considered, ultimately a decision may be made to implement two staging environments connected to both development
and production
data.
Sales Representative Performance Analytics
Several visualisations are capable of being produced from the growing data set in Snowflake, specifically surrounding the performance of sales representatives. Work in this area will also get the team closer to achieving the Gross Profit by Deal objective. The intention is to create a dashboard that is formatted to match the standards realised with the sales and revenue dashboard. This will, however, be slightly more complex. The data will cover a large number of sales representatives and will contain information that is classified as private. In this case, management stakeholders will want access to the complete data set and the design and structural layout of the charts must allow for this, whilst also being capable of being broken down to the individual sales representative level.
Currently, data charts for the sales representatives are created manually and displayed separately, being duplicated for each individual sales representative, this is not a scalable solution going forward. The dashboard must be capable of automatically adding new sales representatives when they are employed, and removing them from the data set should they leave the company. This can be performed with row-level security as discussed in Journal Thirteen. Further research and testing of the business intelligence visualisations will be necessary before a solution can be presented and a decision made.
Naming Conventions
The implementation and documentation of logical naming conventions across the data pipeline are necessary to future-proof the work, ensuring it can be easily referenced at a later date. A significant number of the calculations and parameters are repeatable and a suitable naming structure can make these intuitive to use and easier to deploy by other team members, making sharing and collaboration far simpler. The intention with the naming standards is to be consistent and explicit, and will utilise camel case
.
The naming conventions applied in Tableau extends to worksheets and dashboards, including colour coding to tabs to identify those that have been published to the cloud, those that are retained in the desktop instance only, and those that are undergoing testing. The naming conventions are as follows:
date.
= calculations that relate to dates included automatic date selectionscalc.
= calculation of an aggregated valuews.
= identifies a worksheetdb.
= identifies a dashboard
Tableau includes a feature that allows calculations to be organised into groups which can further help locate generated calculations, these will be grouped by relations.
dbt, which performs the transformation of the data set, produce a style model that can be used as a naming guide. A file and naming structure will be generated based on this model that fits into three categories:
- Staging
- Marts
- Base/Intermediate
The naming and field convention utilises snake_case
, with names that are based on the business terminology as opposed to the source terminology. The structure implemented is as follows:
- Models should have primary keys named as
< object >_id
making it easy to identify the id referenced - Columns that are timestamps should be named
< event >_at
for UTC or include the time zone if a different one is used, such as< event >_at_pt
for pacific time - Booleans should be named with the prefix
is_
orhas_
- Fields that contain revenue should be in decimal currency, for example
19.99
, in instances where decimal currency is not used this should be indicated as followsprice_in_cents
- Maintain consistency across models where possible, for example, keys relating to a
sales person
table should be namedsalesperson_id
instead ofuser_id
- Reserve words should be avoided when naming columns
- Models for base/staging should order the fields into categories with identifiers first and timestamps at the end
Stakeholder Interviews
Part of the wider systems analysis and design process has included interviews with stakeholders globally, this has begun and is likely to take approximately 4 weeks to complete. Further interviews will be scheduled as required.
It is clear from the interviews that have taken place so far that there is a lot of information that stakeholders are looking for that the team did not anticipate, there is also a high degree of overlap, which helps the team to pinpoint a path to focus future efforts. Despite the overlap the scope of the information is broad, extending from Gross Profit at the deal level to gaining insights across the entire lifecycle of a deal, including time in production, the number of revisions, and amount of direct intervention by sales representatives etc. The urgency to gain these business insights and the complexity and granularity level differs from team to team, with the production department having the largest requirements list.
Source data is available that can support business insights capable of answering some of these questions, however, it is unclear at this stage how the deal lifecycle can be tracked to the granularity level indicated. This is the challenge that the data team will face in the coming quarter and early part of next year.
Poster Evening
The focus for the remaining section of this project will be on the recreation of the data pipeline to present at the poster evening. The intention is to display some of the tools deployed and showcase them digitally so they can be manipulated and interacted with in real-time.
Due to the confidentiality of the data involved, a test data set will be deployed that acts as a close facsimile to the workplace data. The data warehouse schema will deploy a fact constellation model that will be integrated with a Tableau instance. The intention is to carry out this work in an iterative manner, producing the greatest output to showcase at the poster evening. Given the time frame and availability of the free trial periods offered by these service providers, the priority will focus first on deploying the data warehouse and integration with the business intelligence tool.
Once a stable instance of the data warehouse is available and visualisation created, time permitting, other data integrations will be established with APIs to ingest similar data that has been included in the workplace pipeline. This may include connections with online spreadsheets or REST-based JSON
APIs. As stated, a lot of what can be accomplished here will depend on the time available, constraints on the length of time of the free trials remaining in place for the poster evening, and the complexity of performing the process individually.
Project Reflections
The project has been incredibly insightful, data warehousing and business intelligence is something I’ve been particularly interested in and am grateful for the opportunity to be involved in the process. To be able to combine this with security and privacy considerations, whilst conducting the systems development using the Scrum methodology in a practical business environment, has been invaluable.
I am particularly pleased with the outcome of the data visualisations in Tableau. My initial perception of these BI solutions did not give enough credit to their capabilities and the complexity of the functionality. It has been an excellent opportunity to test and experience several solutions available in the marketplace, and compare the technical and business features to support the decision making process. Although my career has included the production of analytics for business turnaround and accounting, a lot of the production of charts and metrics was performed using spreadsheets that included manual processes. The ability to automate dashboards and produce filters for manipulation would be invaluable to many businesses and Tableau is an excellent tool for this purpose.
The project has been an excellent practical example of how to implement the methods and processes that have been discussed in previous systems analysis and design courses that make up the degree course majoring in Information Systems. In particular the application of the iterative approach to systems development, the performing of document analysis and stakeholder interviews, and the observation of systems. Understanding the use case and the needs of business users have consistently been a the forefront of everything that has been accomplished.
Perhaps the most significant contribution to personal learning was not ultimately deployed in the pipeline during the project period, being the research and testing of data anonymisation tools and comparing the methodology with that of data pseudonymisation to comply with the GDPR. The methods available to secure individuals personal data are interesting on the conceptual and technical levels. However, they require careful consideration and manipulation to ensure a suitable trade-off is achieved between data privacy and the ability to gain meaningful analytics. I look forward to the opportunity to utilise these techniques in a real-world and practical application.
Due to the scale of the project, it has been impossible to work in each area of the data pipeline, leading to knowledge gaps surrounding the implementation of some of the tools used in the extraction of data. Much of my ETL knowledge is through the development of SQL queries that perform this function from a database to a data warehouse within the same development environment. The intention is to plug some of these gaps over the coming weeks in the production of interactive visualisations for the project’s poster evening.
Overall, the project has revolved around the exact topics and interests that I wanted to learn and experience as a result of working towards a degree in IT. Data warehouse systems design and implementation, the production of data analytics for business intelligence, consideration to data security, and the effect privacy regulations are having on the IT sector are all key learning outcomes, and I am extremely pleased to have had the opportunity to work with a local company to support their goals in what I hope has been a win-win.
Best Practices for Published Data Sources. (n.d.). Retrieved October 27, 2021, from https://help.tableau.com/current/pro/desktop/en-us/publish_datasources_about.htm
Corp. (2021). dbt Labs. https://github.com/dbt-labs/corp/blob/f26309a374ebc7b2bac9833c3fd004ceffdf08cb/dbt_style_guide.md (Original work published 2016)
Development Sandboxes: An Agile Core Practice. (n.d.). Retrieved October 27, 2021, from http://www.agiledata.org/essays/sandboxes.html
How we structure our dbt projects—Modeling. (2019, May 10). Dbt Community Discourse. https://discourse.getdbt.com/t/how-we-structure-our-dbt-projects/355
Manage User Visibility. (n.d.). Retrieved October 27, 2021, from https://help.tableau.com/current/online/en-us/user_visibility.htm
Tableau Naming Conventions: Our Best Advice for Calcs, Sheets & More. (2021, April 9). InterWorks. https://interworks.com/blog/2021/04/09/tableau-naming-conventions-our-best-advice-for-calcs-sheets-more/